Free Shipping on orders over US$99.99 How to make these links
- 41%

Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies

Add your review

Original price was: $131.50.Current price is: $77.35.

9780128027332, Academic Press, Kenneth, Maiese MD

SKU: 128027339 Tags: , , ,
Adobooks Marketplace

4.71

(7 Reviews)

Original price was: $131.50.Current price is: $77.35.

(-41%)
Add to wishlistAdded to wishlistRemoved from wishlist 0
Add to compare

Author: Maiese MD, Kenneth

Brand: Academic Press

Edition: 1

ISBN: 9780128027332

Release Date: 11-03-2016

Package Dimensions: 11.3 x 8.7 x 1.1 inches

Languages: English

Binding: Hardcover

Number Of Pages: 472

Details: Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, oxidative stress, and pathways of programmed cell death that include apoptosis and autophagy. Incorporating a translational medicine approach, this important reference highlights the basic cellular biology of mTOR pathways, presents the role of mTOR during normal physiologic function and disease, and illustrates how the mechanisms of mTOR can be targeted for current and future therapeutic treatment strategies. Coverage of mTOR signaling includes the entire life cycle of cells that impacts multiple systems of the body including those of nervous, cardiovascular, immune, musculoskeletal, endocrine, reproductive, renal, and respiratory origin. Covers the role of mTOR by internationally recognized expert contributors in the field. Provides a clear picture of the complexity of mTOR signaling as well as of the different approaches that could target this pathway at various levels. Includes analysis of the role of mTOR and in both health and disease. Serves as an important resource for a broad audience of healthcare providers, scientists, drug developers, and students in both clinical and research settings.

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies”

Your email address will not be published. Required fields are marked *

Vendor Information

  • Store Name: Adobooks Marketplace
  • Vendor: Adobooks Marketplace
  • 4.71 rating from 7 reviews
Added to wishlistRemoved from wishlist 0
Add to compare
Neurocognitive Development: Normative Development (Volume 173) (Handbook of Clinical Neurology
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $258.29.Current price is: $151.94.
41%
Added to wishlistRemoved from wishlist 0
Add to compare
Waste to Resources: Unlocking Potential Applications of Agricultural Waste
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $187.85.Current price is: $110.50.
41%
Added to wishlistRemoved from wishlist 0
Add to compare
The Papers of George Washington: 1 June–31 August 1793 (Volume 13) (Presidential Series) Hardcover – Illustrated
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $90.94.Current price is: $81.85.
10%
Added to wishlistRemoved from wishlist 0
Add to compare
Foundations of Sleep Health
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $289.00.Current price is: $170.00.
41%
Added to wishlistRemoved from wishlist 0
Add to compare
John Jebb and the Enlightenment Origins of British Radicalism Illustrated Edition 9780275977757
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $95.00.Current price is: $85.50.
10%
Added to wishlistRemoved from wishlist 0
Add to compare
Literature Reviews Made Easy: A Quick Guide to Success (NA) 9781617351914
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $47.75.Current price is: $42.98.
10%
Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies
Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies

Original price was: $131.50.Current price is: $77.35.

Adobooks Marketplace | Affordable Textbooks Online – Buy and Sell College Textbooks
Logo
Compare items
  • Total (0)
Compare
0
Shopping cart